Friday, 29 November 2013

Why everything takes so long in this house

Todays' job, install a new toilet roll holder in the room at the top of the house on the third floor.
1) Take parts, drill, screwdriver and spirit level to the room, a climb of 50 stairs
2) Realise that plasterboard rawl plugs are needed, go down to basement to get new rawl plugs and a different drill - 50 stairs down, 50 stairs back up
3) Attempt to drill hole and find the battery is flat on the drill - 50 stairs down, new battery, 50 stairs up
4) Drill holes, install toilet roll holder.
5) Fetch vacuum cleaner to clean dust - luckily only 15 stairs down and 15 stairs back up as it is on the 2nd floor
6) Clean mess, tidy up and take tools back to basement - 50 stairs down
7) Realise I left a screwdriver on the sink - 50 stairs back up, 50 stairs down
8) Done

Total - 430 stairs 215 down and 215 up!

No comments:

Post a Comment